Link to the Home page Link to the Home page
Information ForAboutResourcesToolsPracticesNewsroomSearch

PATH Case Study

Investing in the Future:

Pulte's Switch to Panelization

---------------------------------------------------------------------------------------------------------------

Printable Version [.pdf, 307 KB]

Scorecard image

Builder:

Stephen Runnels & Chuck Chippero
Pulte Homes
Manassas, Virginia

Builder Type:

Large Production Builder

The Technology:

Panelized Systems

The Project:

Pulte's panelized system is primarily installed in mid- to high-end developments with homes up to 6,000 square feet in Northern Virginia. A dozen of Pulte's large developments in the area are using unique panelized components manufactured in Pulte's Manassas, Virginia plant.


"On average, it takes us 19 days from the day we start to dig the foundation to the day we turn the house over to the mechanical contractor."

-- Stephen Runnels

------------------------------------------------------------------------

PULTE'S STORY

Faced with increasing shortages of skilled labor and the desire to create a market niche through high-performance homes, Pulte Homes made a long-term business decision to invest in innovation. This decision was based on years of internal research and a corporate mission to embrace innovative solutions.

A typical Northern Virginia single-family home built with Pulte high performance panelization. A giant in the industry, Pulte invested significantly in manufacturing capacity to supply its new division, Pulte Home Sciences. From its panel factory, Pulte manufactures concrete foundations, open-web floor joists, structural insulated panel (SIP) external walls, and steel-framed interior walls to create energy-efficient, durable homes. Not every builder can replicate this investment, but any builder can apply Pulte's lessons learned.

FACTORY-BUILT COMPONENTS

Pulte manufactures and supplies factory-built components similar to those that are available from other manufacturers, but Pulte standardized the products by designing and building its own.

"The design and selection of the individual subsystems of our homes were carefully chosen to support our dedication to whole-house performance," says Chuck Chippero, General Manager of Pulte Home Sciences. "We developed individual subsystems that complemented each other from a structural, thermal, moisture management, and--very importantly--assembly standpoint. We deployed them all independently at first, and over time worked them into a full shell system. Our goal was to reduce the ultimate operating cost to the homeowner by providing them with a high-efficiency home."

MOISTURE-RESISTANT FOUNDATIONS

Pulte sees many advantages of precast foundations and has developed some valuable installation procedures.

"We build our foundation in the factory out of a very dense, very high-yield strength concrete," says Stephen Runnels, director of Field Operations for Pulte Home Sciences in Virginia. "We use 5,000+ psi concrete, rather than the industry average of 3,000 psi, for on-site curing. This high density occurs because we pour it at a very long slump, so it's a very liquid pour that self-compacts. The high density in the concrete makes the foundation more water resilient, which is a benefit to the homeowner."

After shipping and installing the concrete panels, site workers apply a moisture curing urethane at the seams of the foundation.

"Because the inside of the urethane coating remains pliable, it functions like a gasket seal," says Runnels. "If ground movement occurs, the walls may move and in extreme cases may tear the skin of the urethane. When this happens, the urethane sealant skins over the seam again to maintain the seal. So you get a good gasket seal even if there is movement in the foundation.

We're talking minimum movement, but in conventional pour-in-place concrete foundations, it can lead to long-term problems like cracking, leaks, and bridging."


Next Page >>




Stephen Runnels & Chuck Chippero


Chuck Chippero has been General Manager of Pulte Home Sciences for the past 5 years. He has over 20 years experience in automotive component manufacturing and engineering.

Stephen Runnels is a journeyman in five trades with over 30 years in the manufacturing and installation of construction components, and extensive study in Construction and Business Sciences. For the last six years, he has worked with Pulte Home Sciences developing the Premier PHS-Systems.

Why Pulte builds with panelized systems:

"The primary objective was to build a higher-performing house faster. We also saw that the number of skilled carpenters is declining, and we wanted to be ahead of the curve so that we can limit our exposure to labor shortages."


Page 1 | Page 2 | Page 3 | Page 4 | Printable Version [.pdf, 307 KB]